Log:
valutazioni - 1, GPA: 4 ( )

Istruzioni per l'uso Genie, Modello 1024

Produttore : Genie
File Size : 3.42 mb
File Nome : 9a2e1e8a-a7d3-451a-b7ea-231db5717947.pdf
Lingua di insegnamento: en
Vai a scaricare



Facilità d'uso


2-3). NOTE: For header bracket and bolts locate Bag 2from Box 1. NOTE: The bolts supplied in Bag 2 are designedto be used on pressure treated lumber. 2. Mounting the header bracket. • Hold header bracket against wall (Fig. 2-3). • Position bracket as shown. – Place center on vertical line. – Bottom edge on final height line. • Mark screw hole locations on wall. • Drill 3/16" pilot holes at each screw hole mark. – Fasten header bracket with 2 lag screws (provided) (Fig. 2-3). Header bracket must be fastened to garage framing. Do NOT fasten to drywall, p board, plaster or other such materials. CAUTION 2-1/2" top of door in closed position d) - final height mark HIGHEST POINT OF TRAVEL TRACK SECTIONAL DOOR HEADER FROM HERE TO FLOOR 2-1/2" HIGHEST POINT OF TRAVEL TRACK SECTIONAL DOOR HEADER FROM HERE TO FLOOR a) - 6" vertical line b) - extend vertical line c) - door at highest point door at highest point door at highest point final height mark final heightmark 2-1/2" FIG. 2-3 Header bracket mounting (on header & above header). Door springs are under high tension. If spring or its shaft is in the way, measure 2-1/2" above spring or shaft on the garage door centerline and mark this height as your location for header bracket. Do NOT move door spring! WARNING PN# 3642036212, 8/09/2007 12 MOUNTING THE OPERATOR: 1. Getting started. • Position assembled rail on wall next to header bracket. (Fig. 2-4). – Place material on floor under power head to protect from scratching. (A box, stool, or similar device may be needed to clear a torsion spring.) NOTE: For header bracket pins locate Bag 2 from Box 1. 2. Mounting the assembly. • Attach rail to header bracket using clevis pin and cotter pin. • Support power head on step-ladder to prevent interference with header mounted spring (Fig. 2-5). NOTE: Before final attachment to ceiling, insure that assembly is in proper alignment (Fig. 2-4). NOTE: For nuts, bolts, and lag screws locate Bag 3 from Box 1. • On finished ceilings, locate ceiling joists or trusses using a stud finder or similar device. Attach angle iron (not provided) to joists or trusses through finish material using (provided) lag screws (Fig. 2-6). • On unfinished ceilings or open ceilings, straps may attach directly to joists or trusses. Depending on the garage construction, extra framing material (not provided) may be required which should be installed using appropriate construction techniques (Fig. 2-6). NOTE: Refer to your local building codes for appropriate construction techniques. • Attach mounting straps to ceiling using lag bolts (Fig. 2-6). • Set height of power head to following: (Fig. 2-6). a) Rail must clear door at door’s highest point of travel. b) Be level or power head slightly below level. • Securely tighten power head mounting bolts and nuts. • Lower door. • Check that rail clamp bolts and nuts are tight. • DO NOT PLUG UNIT IN YET! YES / SI / OUI NO NO FIG. 2-4 Position assembly and align. VIEW FROM ABOVE (not to scale) HEADER BRACKET Mounting Straps (not provided) FIG. 2-6 Mounting the power head. ANGLE IRON ON FINISHED CEILING Attach angle iron to beams UNFINISHED OR OPEN BEAM Extra framing not needed Extra framing NEEDED DRYWALL bolts & nuts bolts & nuts FIG. 2-5 Rail mounting to header bracket. COTTER PIN CLEVIS PIN PN# 3642036212, 8/09/2007 DOOR BRACKET: Doors made of masonite, lightweight wood, fiberglass, and sheet metal must be properly braced before mounting door operator. Contact door manufacturer or distributor for a bracing kit. The Genie Company is not responsible for damage caused due to improperly braced door. CAUTION DOOR BRACKET: Doors made of masonite, lightweight wood, fiberglass, and sheet metal must be properly braced before mounting door operator. Contact door manufacturer or distributor for a bracing kit. The Genie Company is not responsible for damage caused due to improperly braced door. CAUTION NOTE: For door bracket and bolts locate Bag 4from Box 2. 1. Finding door bracket mounting location. • Door bracket is mounted as high on door as possible along vertical centerline and NO LOWER THAN top set of rollers (Fig. 2-7). 2. Mounting the door bracket. • Proper bracing should be verified at this point. – Align door bracket centered on your vertical centerline (Fig. 2-8). – Attach using 3 self-drilling screws for sheet metal or other light weight material. – Use lag screws (not provided) for solid wooden sectional doors. NOTE: For solid wood doors, carriage boltsWITHOUT SLOTTED HEADS (not included) mayalso be used for attaching door bracket. INSTALL DOOR ARMS NOTE: For door arm nuts and bolts, clevis andcotter pins locate Bag 5 from Box 2. 1. Attach the arms. • Fasten curved door arm to door bracket using bolt and locking nut. (Fig. 2-9). • Fasten straight arm to carriage using clevis pin and cotter pin. (Fig. 2-9). 2. Connecting the arms. • Slide carriage back and forth to adjust arm length. – Position the straight arm 50. down from the rail. • With the arms arranged in thi...

Questo manuale è adatto anche per i modelli :
Cancello automatico - 1022 (3.42 mb)

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie