Produttore : Chamberlain
File Size : 5.05 mb
File Nome :
|
Facilità d'uso
• Activate gate ONLY when the gate is in full view and free from any obstructions. • ALWAYS keep gate in sight until completely closed. NEVER permit anyone to cross the path of the moving gate. • ALWAYS keep gate in good repair and make sure it moves freely. An improperly maintained gate may not reverse when required and could result in SEVERE PERSONAL INJURY or DEATH. WARNING 7 41A3489 Trolley 41A4353 Header Bracket 41A3611-2 Chain in Dispensing Carton 178B35 Curved Door Arm Section 178B34 Straight Door Arm Section Safety Labels and Literature 31D380 Sprocket Cover 12B350 Hanging Brackets UP CEILING MOUNT ONLY 41A5047 Door Bracket 41A5276-14 Multi-Function Door Control LOCK LIGHT 971-315LM SECURITY.® Single-Button Remote Control Transmitter (2) 1B3117 Rail Center Section TO GARAGE DOOR 183B110 Rail End Section (each) Model 1220E Only Model 1210E Only Model 1210E Model 1220E Only Model 1210E Only 41A4208 Chain Spreader and Screws Chain Pulley Bracket 41A2780 41A5577-1 Lighted Door Control Button Motor Unit and Light Lens Motor Unit with 2 Light Lenses Model 1220E OR 41B4494-1 2-Conductor Bell Wire White & White/Red Your garage door opener is packaged in two cartons which contains the motor unit and the parts illustrated below. Note that accessories will depend on the model purchased. If anything is missing, carefully check the packing material. Parts may be stuck in the foam. Hardware for assembly and installation is shown on the next page. Save the carton and packing material until installation and adjustment is complete. Carton Inventory Model 1225E Only Model 1215E Only Model 1215E Model 1225E Model 1225E Only Model 1215E Only Hardware Inventory Separate all hardware and group as shown below for the assembly and installation procedures. Screw6ABx1-1/4" (2) Clevis Pin 5/16"x2-3/4" (1) NOTICE Handle Insulated Staples (10) Drywall Anchors (2) Clevis Pin 5/16"x1" (2) Rope Carriage Bolt 5/16"-18x2-1/2" (2) Ring Fastener (3) Trolley Threaded Shaft (1) Lock Washer 5/16" (6) Lag Screw5/16"-9x1-5/8" (4) 8 ASSEMBLY STEP 1 For Sectional and One-Piece Doors ONLY Assemble the Rail and Attach the Chain Pulley Bracket To avoid installation difficulties, do not run the garage door opener until instructed to do so. 1. Place the 3 rail sections on a flat surface for assembly. The end sections are identical. The center section must be positioned with the braces against the end sections as shown. Make sure the "directional arrow" on the center section is pointing toward the front (to door). Study the illustration carefully. 2. Bolt rail sections together with the hardware illustrated and from the direction indicated. (When assembled, rail has a front-to-back position as shown.) NOTE: If rail is not assembled exactly as shown, trolley will not travel smoothly along length of rail 11 mm Socket Wrench or it will hit against nuts. 3. Position the chain pulley bracket on the front end Lock Nut 1/4"-20 Carriage Bolts 1/4"-20x1/2" Hex Bolt 5/16"-18x7/8" Nut 5/16"-18 Lock Washer 5/16" HARDWARE SHOWN ACTUAL SIZE of the rail as shown. Fasten securely with the hardware provided. NOTE: When tightening the bolts be sure to keep bracket parallel to the rail. Otherwise, the rail may bow when the opener is operated. Rail (Center Section) 1/4'' Lock Nut RAIL FRONT (TO DOOR) Chain pulley bracket attaches to FRONT END of Rail Rail (End Section) RAIL BACK (TO OPENER) Rail (End Section) Carriage Bolt 1/4"-20x1/2" Brace Brace Square Carriage Bolt Holes TOGARAGEDOOR Hex Bolts 5/16"-18x7/8" Rail Bracket & RailMust Be Aligned Lock Washer 5/16" Nut 5/16" Chain Pulley Bracket 13 mm Socket Wrench 9 ASSEMBLY STEP 1 For Sliding and Swinging Gates ONLY Assemble the Rail and Attach the Chain Pulley Bracket To avoid installation difficulties, do not run the garage door opener until instructed to do so. 1. Place the 3 rail sections on a flat surface for assembly. The end sections are identical. Make sure the "arrow label" on the center section is pointing in the direction shown in the illustration. 2. Connect the center section and the 1/4" lock nuts to the end sections from the same side, as shown. NOTE: If rail is not assembled exactly as shown, trolley will not travel smoothly along length of rail or it will hit against nuts. 3. Insert the carriage bolts from the opposite side of the end sections. Tighten the nuts. When assembled, rail has a front-to-back position as shown. Lock Nut 1/4"-20 Carriage Bolts 1/4"-20x1/2" Hex Bolt 5/16"-18x7/8" Nut 5/16"-18 Lock Washer 5/16" HARDWARE SHOWN ACTUAL SIZE 11 mm Socket Wrench Chain pulley bracket attaches to this end of Rail 4. Position the chain pulley bracket on the front end of the rail as shown. Fasten securely with the hardware provided. NOTE: When tightening the bolts be sure to keep bracket parallel to the rail. Otherwise, the rail may bow when the opener is operated. Rail (Center Section) 1/4'' Lock Nut Rail (End Section) Carriage Bolt 1/4"-20x1/2" Brace Square Carriage Bolt Holes TO GARAGE DOOR AWAY FROM...
Questo manuale è adatto anche per i modelli :Cancello automatico - 1215E FS2 (5.05 mb)