Log:
valutazioni - 0, GPA: 4 ( )

Istruzioni per l'uso Majestic Appliances, Modello 360DVS3

Produttore : Majestic Appliances
File Size : 2.98 mb
File Nome :
Lingua di insegnamento: en
Vai a scaricare



Facilità d'uso


For elevations above 4,500 feet (1,370 m) in USA, installations must be in accordance with the current ANSI Z223.1/NFPA 54 and/or local codes having jurisdiction. In Canada, please consult provincial and/or local authorities having jurisdiction for installations above 4,500 feet (1,370 m). Gas Line Installation When purging the gas lines, the window frame assembly must be removed. The gas pipeline can be brought in through the vent end of the fireplace as well as the bottom. Knockouts (to allow gas pipe installation and testing any gas connection) are provided on the bottom behind the valve. It is most convenient to bring the gas line in from the vent end of the valve, as this allows fan installation or removal without disconnecting the gas line. The gas line connection can be made with properly tinned 3/8” copper tubing, 3/8” rigid pipe, or an approved flex connector. Since some municipalities have additional local codes, it is always best to consult your local authority and the CSA-B149.1 installation codes. For USA installations, consult the current National Fuel Gas Code, ANSI Z223.1/NFPA 54. Always check for gas leaks with a mild soap and water solution. Do not use an open flame for leak testing. The gas control is equipped with a captured-screw type pressure test point, therefore it is not necessary to provide a 1/8” test point upstream of the control. 10 10006326 1/2” Gas Supply 1/2” NPT X 1/2” Flare Shut-Off Valve 3/8” Flex Line (From Valve) FP297a Fig. 5 Gas shutoff valve and flex connector. When using copper or flex connector, use only approved fittings. Always provide a union when using black iron pipe so that the gas line can be easily disconnected for burner or fan servicing. Refer to the gas specification for pressure details and ratings. Isolate or disconnect this or any other gas appliance control from the gas line when pressure testing. DO NOT subject the fireplace valve to test pressures exceeding 1/2 psi. EB-1 Electrical Junction Box Connection The fireplace, when installed, must be electrically connected and grounded in accordance with local codes; in the absence of local codes, use the current CSA C22.1 Canadian Electrical Code. For USA installations, follow the local codes and National Electrical Code ANSI/ NFPA No. 70. It is strongly suggested the wiring of the EB-1 Electrical Junction Box be carried out by a licensed electrician. Ensure power to the supply line has been disconnected before commencing with this procedure. The EB-1 electrical junction box has been supplied standard on this model to allow for easy connection of the optional fan kits. (Fig. 6) To connect the EB-1 box to the house electrical supply follow the steps below. 1. Remove the front cover of the EB-1 box. 2. Remove the plug socket assembly from the EB-1 box. 3. Feed the supply line in from the out through the electrical knockout. 4. Connect the ground wire of the supply line to the green screw of the socket assembly. 5. Connect the white wire of the power line to the chrome screw of the socket assembly. 6. Connect the black wire of the power supply line to the brass screw (polarized) of the socket assembly. 360DVS Series Direct Vent Fireplaces 7. Refit the socket assembly back into the electrical box and replace the cover plate. 8. The EB-1 electrical junction box is now ready to supply power to the FK12 or FK24 fan kit, if used. Electrical Inlet Hole Gas Inlet Hole EB-1 Electrical box Depend- ing on the specific model, this box may be installed on either side of the appliance. FP1428 Fig. 6 EB-1 attachment. Remote ON/OFF Switch Installation Do not wire the remote ON/OFF wall switch for this gas appliance into a 120V power supply. 1. Thread the wiring through the holes on the end panels of the appliance. Take care not to cut the wire or insulation on metal edges. Route the wire to a conveniently located receptacle box. 2. Attach the wire to the ON/OFF switch and install the switch into the receptacle box. 3. Connect the other ends of the wire to the gas control valve, as shown in Figure 7. Remote ON/OFF Switch Gas TP Control TH Valve TP TH FP1429 Fig. 7 Remote switch wiring diagram for R models. Alternate Switch Location The remote switch can be installed on the front or the side of the access door. Simply mount the switch to the bracket provided and screw the bracket to either side of the frame, lining up the screws with the prepunched holes. (Fig. 8) 12 360 DVS Series Direct Vent Fireplaces 10006326 FP1430 Fig. 8 Alternate switch location. Optional Top Vent Application This appliance is shipped as a rear vent unit. If the installation layout requires the unit to be a top vent configuration, the appliance can be converted by following the steps below. When removing and refitting the plates and adapter, be sure the associated gasket is undamaged and refitted as required. 1. Remove the ten (10) screws securing the outer collar adapter to the fireplace body. (Fig. 9) 2. Set the collar aside, complete with the gaske...

Questo manuale è adatto anche per i modelli :
Camini - 360DVS2 (2.98 mb)
Camini - 360DVSL (2.98 mb)
Camini - 360DVSR (2.98 mb)

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie