|
Facilità d'uso
approved grounding device. 4. The factory-built fireplace must meet (UM)84-HUD requirements for outside combustion air supply to the fireplace fire chamber and the chimney must be listed to UL103 HT or a listed UL 1777 full length 6 inch (152mm) diameter liner must be used. It must be equipped with a spark arrestor cap and the outside air must be installed on the insert. 5. In Canada, this appliance must be connected to a 6 inch (152mm) factory-built chimney conforming to CAN/ULC-S610, STANDARD FOR FACTORY BUILT CHIMNEYS. 6. Follow the chimney and chimney connector manufacturer’s instructions when installing the flue system for use in a mobile home. 7. Maintain clearance to combustibles. 8. Floor protection requirements must be followed precisely. 9. Use silicone to create an effective vapor barrier at the location where the chimney or other component penetrates to the exterior of the structure. 10. Burn wood only. Other types of fuels may generate poisonous gases (e.g., carbon monoxide). 11. If unit burns poorly while an exhaust blower is on in home, (i.e., range hood), increase combustion air. Figure 20.1 WARNING Fire Risk. Asphyxiation Risk. Do not draw outside combustion air from: • Wall, floor or ceiling cavity • Enclosed space such as an attic or garage • Close proximity to exhaust vents or chimneys. Fumes or odor may result CAUTION THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED Do NOT cut through: • Floor joist, wall, studs or ceiling trusses. • Any supporting material that would affect the structural integrity. WARNING Asphyxiation Risk. • Never install in a sleeping room. Consumes oxygen in the room. NOTE: Top sections of chimney must be removable to allow maximum clearance of 13.5 feet (411cm) from ground level for transportation purposes. 7 Appliance Set-up C. Panel & Trim Set Installation A. Installation Outline Standard Size: 30-1/2” h x 47” w Large Size: 34-1/4” h x 51-1/4” w 1. Record serial number on back cover of manual. 2. Remove the leveling bolts from the component pack and start the bolts in the weld nuts. Figure 21.1. 3. Position insert on hearth with rear of insert extending into fireplace opening. Slide insert on its base into the opening leaving approximately 4 inches (102mm) protruding out the front. 4. Assemble the panels and temporarily attach to insert. Push insert into opening leaving 1 inch (25mm) protruding out the front. Confirm the panel size is correct for the opening and that the face can be sealed off from room air when installation is complete. Figures 21.2 & 21.3. 5. Remove the panels and secure liner to the chimney ring. 6. Level the insert in its final position in the fireplace. If an offset adapter is required for installation, install it first and then secure liner to offset adapter. 7. Install the Panel & Trim set and (if applicable) the Zero Clearance Trim Support. Kit Includes: (2) Side panels, left & right (1) Panel top & fastener package (2) Side trim, left & right (1) Trim top & fastener package. Tools Needed: Screwdrivers: Powered Phillips head Long-handled Phillips head 1. Attaching Panels to the Insert a. Loosely install the 2 side panels, do not tighten, using the cage nuts already attached to the appliance. (Note: The sides are not interchangeable). Figure 21.3. b. Put top panel in place pushing straight back and then to the right to lock onto top of side panels. Attach the top panel to the sides using the panel brackets included in the fasteners package. Figure 21.2. c. Tighten side panels to the appliance using a long- handle screw driver. B. Leveling Bolts Do not tighten sides until top is locked into placePanel brackets Two leveling bolts, 3/8” x 4” are shipped inside the component pack found inside the firebox. NOTE: Not all installations will require the use of the leveling bolts. 1. Remove the bolts from the component pack and insert into weld nuts welded to each side of the insert bottom Figure 21.1. 2. After securing the liner to the flue collar (or offset adapter) and the insert is in its final position, extend bolts downward to level insert. .......................... Figure 21.2 Back view of top and side panel assembledPanel bracketCage nut Figure 21.3 Figure 21.1 D. Securing Liner to Flue Collar 2. Assembling Trim a. Place protective covering on surface to be used to assemble the trim pieces. Lay the trim face down. b. Attach the 2 side trim pieces to the top trim at each corner using the “L” bracket included in fasteners package. Slide assembled trim over panel set. Figure 22.1. NOTE: If you have a mantel, you may need to install the trim on your panels before you push the insert into the fireplace opening. If not, you can slide the trim over the panel set after the insert is in its final position. There are two options to secure the liner to the flue collar: Option One: If there is enough room on the top of the insert to work, hand bend the 2 tabs upward 90°. Secure the liner with the supplied h...
Questo manuale è adatto anche per i modelli :Camini - 5100I-GD-B (3.93 mb)