Log:
valutazioni - 4, GPA: 3.8 ( )

Istruzioni per l'uso Hampton Direct, Modello H25-LP1 Propane

Produttore : Hampton Direct
File Size : 4.01 mb
File Nome : e835bc36-cf80-484c-8199-24b356787174.pdf
Lingua di insegnamento: en
Vai a scaricare



Facilità d'uso


Note: Must remove 4 screws from stove collar and rotate 130o to have collar facing straight back. Secure into place with 4 screws. VERTICAL TERMINATION WITH CO-LINEAR FLEX SYSTEM THE APPLIANCE MUST NOT BE CONNECTED TO A CHIMNEY FLUE SERVING A SEPARATE SOLID FUEL BURNING APPLIANCE. This appliance is designed to be attached to two 3" (76mm) co-linear aluminium fl ex running the full length of the chimney. See the Venting Arrangements chart below for minimum and maximum fl ue lengths. See chart below for minimum distances from roof. Periodically check that the vent is unrestricted. Masonry chimneys may take various contours which the fl exible liner will accommodate. However, keep the fl exible liner as straight as possible, avoid unnecessary bending. The Air Intake pipe must be attached to the inlet air collar of the termination cap. Straight Vertical Terminations INSTALLATION Required Parts: Part # Description 946-529 Co-linear DV Vertical Termination Cap 948-305 3" Flex - 35 ft. 946-563 Co-Axial to Co-Linear Adapter Kit which contains the following: Co-linear Flex Adapter (270-585) Outer Pipe (946-257) Inner Pipe Adapter (946-219) Alternate Approved Caps 980 Vertical Termination Cap 991 High Wind Cap 923GK 3" Co-linear Adapter with fl ashing Vent Restrictors set at fully open, Posiiton "A" INSTALLATION DV STOVE HORIZONTAL VENT KIT DV 2 ft. Stove Vent Kit (Part # 946-116) and DV 4 ft. Stove Vent Kit (946-216) includes all the parts needed to install the H25 Direct Vent unit with minimum horizontal and vertical vent dimensions. For installations that require longer vertical and/or horizontal vents use the Dura-Vent system as shown in the "Dura-Vent Termination Kit" and "Dura-Vent Venting Components" sections. Qty. Description 1) 1 Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length, Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter 2) 1 Flex Liner, compressed aluminium 2 ply liner, 4" (102mm) inside diameter 3) 4 spring spacers 4) 1 90 deg. Elbow 5) 1 Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pcs. 6) 1 Thimble Cover 7) 1 Wall Thimble (2 pcs.) 8) 1 Adapter 9) 1 AstroCap Termination Cap 10) 2 Trim Collars 11) 1 Tube of Mill-Pac, high temperature sealant 12) 12 Screws, #8 x 1/2" Self tapping, Stainless Steel 13) 14 Screws, #8 x 1/2" Self tapping, Black 14) 4 Screws #8 x 1-1/2" Drill Point, Black 15) 4 Screws #8 x 1-1/2" Drill Point, Stainless Steel 16) 8 Wood screws #8 x 1" Note: a) Liner sections should be con- tinuous without any joints or seams. b) This is an approved system, there- fore components in this system must not be substituted for any other manufacturer's products. DV STOVE HORIZONTAL VENT KIT (#946-116 & #946-216) INSTALLATION Review the following sequence of instructions which are typical of most installations. The sequence may vary depending on wall thickness. See the "Exterior Vent Terminal Locations" section for vent location and clearance dimensions, and "Vent Restrictor Position" section to set the Vent Restrictor to the correct position. 1) Set the unit in its desired location. Check to determine if wall studs will be in the way of the venting system, adjust location until all clearances are met and there are no obstructions. Note: A 1-1/2"(38mm) clearance around the outer pipe must be maintained except that only a 1" (25mm) clearance is needed at the termination end. IMPORTANT: Do not locate termination hood where excessive snow or ice buildup may occur. Be sure to check vent termination area after snow falls, and clear to prevent accidental blockage of venting system. When using snow blowers, make sure snow is not directed towards vent termination area. b) Install wall thimbles on both interior and exterior wall with 4 wood screws (#8 x 1") per thimble. c) Attach the 2 piece adjustable pipe section to the vent terminal and slide into position from the exterior. The larger diameter end of the adjustable pipe goes to the vent terminal. d) Install the 90o elbow onto the adjustable pipe to determine the vertical centerline. Note: if the centerline cannot be met, the adjustable sections will have to be cut. e) Cut the 4 ft. section of rigid pipe to length. Attach the 45o elbow to the rigid pipe, and ensure that the pipe length when cut (with the 45o elbow) will seat onto both the starter collar and the 90o elbow. Crimped section of rigid pipe seats into the 90o elbow. Only cut the uncrimped side of pipe. Dismantle all pipe sections including vent terminal. 2) Assemble a trial fi t to determine the vertical center-line for the vent termination. a) Cut a 9-1/2" x 9-1/2" (241mm x 241 mm) square hole on both the interior and exterior wall. Hampton® H25-1 Direct Vent Freestanding Gas Stove INSTALLATION Note: If installing ter- mination on a siding covered wall, a vinyl sid- ing standoff or furring strips 3) Attach the 4" dia. flex liner to the vent terminal ensuring that the flex overlaps the collar of the vent terminal by a minimum of 1-3/8"(35mm). Use Mill-Pac ...

Questo manuale è adatto anche per i modelli :
Camini - H25-NG1, H25-LP1 (4.01 mb)

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie