Log:
valutazioni - 4, GPA: 4 ( )

Istruzioni per l'uso Haier, Modello AB182ACERA

Produttore : Haier
File Size : 877.88 kb
File Nome :
Lingua di insegnamento: en
Vai a scaricare



Facilità d'uso


If downward slope can't be made, take other measures to lift it up. Keep a distance of 1-1.5m between suspending brackets, to make water hose straight. Slope over 1/100 1-1.5m Use the self-provided stiff pipe and clamp with unit. Insert water pipe into water plug until it reaches thewhite tape. Tighten the clip until head of the screw is less than 4mm from hose. Wind the drain hose to the clip using seal pad 9 . Insulate drain hose in the room. 1 Clamp Tape (White) Self-provided stiff pipe 4mm below (accessory) (accessory) Large size seal pad Clamp 10 Installation height shall be less than 280mm. There should be a right angle with unit, 300mm from unit. 75 below Self-provided stiff pipe (accessory) 500 below 300mm below 1~1.5m 280 below500 below220 Drain hose (accessory) drain water lifting pipe Suspending bracket Clamp (accessory) (Note) The slope of water drain hose (1) shall be within 75mm, don't apply too much force on it. If several water hoses join together, do as per following proceedures. Connect water hoses with a T joint. Over 100 Specifieations of the water hoses shall meet the requirements for the unit running. 23 24 Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and check that the dimension of the ceiling opening is correct. Take off the lever gauge before install the ornament panel. Fasten the screws to make the height difference between the two sides of indoor unit less than 5mm. First fix it with screws temporally. Fasten the two temporally fixing screws and other two, and tighten the four screws. Connect the wires of synchro-motor. Connect the wire of signal. If no response of remote controller, check whether the wiring is correct, restart remote controller 10 seconds after shut off power supply. Install the panel board in the direction shown in the figure. The incorrect direction will result in water leakage, meanwhile swing and signal receiving are displayed that cannot be connected. (For series 182 ) AB182ACEAA POWER SUPPLY: 1PH,220-230V~,50Hz 1 2 3 L N 1 2 3 Electric control box Y/G Y/G INDOOR UNIT TERMINAL BLOCK OUTDOOR UNIT TERMINAL BLOCK Installation Procedure Installation Procedure (2) Check if water drainage is smooth after installation. (For series 242, 282, 362, 522, 482, 602 ) Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage. After wiring Remove cover of control box, connect 1PH power to terminal 1 and 2 on terminal block.,use remotecontroller to operate the unit. Note, in this operation, fan will be running. Upon confirmation of a smooth water drainage, be sure to cut off power supply. Check water drainage in cooling operation. Method of water charging Charge water from air outlet Charge water frominspecting hole Watering can of plastic pipe should be about 100 mm long 100mm Water drainage port formaintenance (Drain water from this hole) Self-provided stiff pipe Maintenance Inspecting hole 1 2 3 D OUTDOOR UNIT TERMINAL BLOCK INDOOR UNIT TERMINAL BLOCK POWER SUPPLY: 380-400V,3N~,50Hz R S T N 1 2 3 1 2 3 Y/G Y/G Y/G1 2 3 1PH,220-230V~,50HzPOWER SUPPLY: INDOOR UNIT TERMINAL BLOCK L N 1 2 3 Y/G (For series 362, 522, 482, 602 ) (For series 242, 282, 362,AB182ACERA ) OUTDOOR UNIT TERMINAL BLOCK When wiring is not complete Cover of controll box PCB on indoor unit Terminal block Connect with outdoor unit Terminal block 25 Installation Procedure 7 WIRING All supplied parts. materials and wiring operation must in appliance with local code and regulations. Use copper wire only. When make wiring, please refer to wiring diagram also. All wiring work must be done by qualified electricians. A circuit breaker must be installed, which can cut power supply to all system. See Installation Manual of outdoor unit for specifications of wires, circuit breaker, switches and wiring etc. Connecting of unit Remove cover of switch box (1) , drag wires into rubber tube A, then, after proper wiring with other wires, tighten clamp A. Connect wires of correct pole to the terminal block inside. Wind seal 12 around wires. (Be sure to do that, or, dew may occur). Upon connecting, replace control box cover (1) and (2). Terminal block Cover of control box(1) Rubber tube A Grounding lead Cover of control box(2) OutIn Field wiringAttach seal pad Don't fail to seal it, or water may come in. Rubber tube Note: Have it sealed, leaving no space. Seal pad (small size ) (Wind around wire) * 12 As for outdoor unit circuit, please see Installation Manual of outdoor unit. Note: All electric wires have their own poles, poles must match that on terminal block. WIRING EXAMPLE8 Obscrve the following when connecting power supply terminal block: Don't connect wires of different specifications to the same terminal block. (Loose wire may cause overheating of circuit) Connect wires of same specifications as shown in right Fig. Connect wires of the same specifications at two side...

Questo manuale è adatto anche per i modelli :
Condizionatori - AB182ACEAA (877.88 kb)
Condizionatori - AB242ACEAA (877.88 kb)
Condizionatori - AB242ACERA (877.88 kb)
Condizionatori - AB282ACEAA (877.88 kb)

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie