|
Facilità d'uso
J - 8/07) EDFP210FP*B EDFP214FP*B EDFP217FP*B FINISHED FLOOR Wall should already be framed Shown dimensions pertain to These dimensions are required ANSI Standard A117.1. and ADA (Framing shown for reference Remove bottom cover 2. Install the fountain 3. using bolts and washers (not provided). Tighten securely. Attach drain tube4. to fountain and cut Install freeze-resistant - see box instructions. Replace6. bottom cover. 97565C (Rev. J - 8/07) PAGE 4 EDFP217FPMOUNTING BOLT AND ACCESS HOLE LAYOUT FIG. 3 EDFP210FP*B EDFP214FP*B EDFP217FP*B FINISHED FLOORLEGEND A = 3/8" DIA. (10mm) SLOTS (FOR MOUNTINGUPPER HANGER BRACKET)B = 7/8" DIA. (22mm) HOLE FOR SUPPLY TUBEC = 7/8" DIA. (22mm) HOLE = MOUNTING BOLT LOCATIONS (8) (3/8" DIA. NOT PROVIDED)E = 1-3/4" (44mm) LINE EDFP217FPROUGH-IN DRAWINGS FIG. 4 PAGE 5 97565C (Rev. J - 8/07) EDFP210FP*B EDFP214FP*B EDFP217FP*B FINISHED FLOOR Wall should already be framed Shown dimensions pertain to installation These dimensions are required ANSI Standard A117.1. and ADA (Framing shown for reference Remove bottom covers from 2. Install the fountains 3. using bolts and washers (not provided). Tighten securely. Attach drain tubes4. to fountains and cut Install freeze-resistant - see box instructions. Replace6. bottom covers. EDFP210FP*B EDFP214FP*B EDFP217FP*B FIG. 8 FIG. 9 FIG. 5 FIG. 6 See Fig. 9 See Fig. 5 FIG. 7 CABLE SHEATH ADJUSTMENT To Increase Free Play To Reduce Free Play 97565C (Rev. J - 8/07) PAGE 6 EDFP210FP*B EDFP214FP*B EDFP217FP*B The freeze resistant package must be mounted on an interior wall in a heated area. The room temperature of the interior heated area must be 50° F (10° C) or higher. The freeze resistant package may be surface or recessed mounted. If recess mounted the surface of the cover must be flush with the interior wall surface. The package is furnished with screws for mounting the cover to the box. If the box is recess mounted, do not fasten the top and bottom of the cover to the box. Use the holes on the front only. 1. Assemble the operating cable to the fountain bracket. (Fountain should be mounted to exterior wall) Create a loop in the cable and thread the free end of the cable through the wall into the freeze resistant box. The adjustment nuts should be in the middle of threaded area on the operating cable. See Figure 9 2. Connect free end of operating cable to the valve-operating bracket. The end of the cables must be recessed into the indents on the pivot brackets. 3. Remove cable free play by adjusting the jam nuts on the ends of the operating cable. See Figure 6 4. Connect water line from fountain bubbler into freeze resistant box. The connection to the box uses a quick connect water fitting. Position the water line, in the fountain, to drain back into interior mounted box. Any water left standing, in the exterior line, can freeze. To insert tubing, push tube straight into fitting until it reaches a positive stop. To remove tubing from the fittings, relieve water pressure, push i...
Questo manuale è adatto anche per i modelli :congelatori - EDFP214FPC (92.59 kb)
congelatori - EDFP217FPC (92.59 kb)