|
Facilità d'uso
WARNING: Pregnancy. If you are or think you may be pregnant, consult your physician before using the bathtub. Use this unit only for its intended use as described in this manual. Do not use any attachments not recommended by American Standard. The unit must be connected only to a supply circuit that is properly protected by a ground-fault circuit-interrupter (GFCI). Such a GFCI should be provided by the installer and should be tested on a routine basis. To test the GFCI, push the test button. The GFCI should interrupt power. Push the reset button. Power should be restored. If the GFCI fails to operate in this manner, the GFCI is defective. If the GFCI interrupts power to the bathtub without the test button being pushed, a ground current is flowing, indicating the possibility of an electric shock. Do not use this air bath. Disconnect the air bath and have the problem corrected by a licensed electrician before using. SAVE THESE INSTRUCTIONS Installation and Framing Instructions Each bath arrives ready for installation, completely equipped with the pump/blower electronics and plumbing necessary for operation. However, a drain/overflow kit is required for each bath and it is not included. The variety of installations for this bath may require framing procedures other than those shown. Locate studs as required. Ensure roughing-in dimensions are proper, plumb, and square. ! Remove the bath from the carton. Retain the shipping carton until satisfactory inspection of the product has been made. Do not lift the bath by the plumbing at any time; handle by the shell only. ! All bath units are factory tested for proper operation and watertight connections prior to shipping. Prior to installation, the bath must be filled with water and operated to check for leaks that may have resulted from shipping damage or mishandling. ! The sumps of these baths are supported by feet and no additional sump support is required. Once the bath is in place, the feet should be shimmed and secured accordingly so that the rim of the bath contacts the stringer or pier but supports no weight. ! Provisions must be made in all installations for an access opening for servicing the bath pump/blower. Unless an access opening of at least 12" x 24" (305mm x 610mm) is provided, warranty service will not be performed. It is strongly recommended that an additional opening be provided for access to drain components. ! Each bath has a nominal length (L), width (W), and Height (H) along with a rim height. Unless otherwise noted in the following rough-in references, assume that the nominal tolerances are as much as +/-1/4 inch (6mm). Therefore, it is strongly recommended that the installer build the surrounding structure after receiving the actual bath. Structural measurements should be verified against the actual bath received to ensure proper fit. POST INSTALLATION CLEAN-UP Remove all construction debris from bath. Tile grout can be removed with a wooden popsicle stick or tongue depressor. Do not use wire brushes or any other metal implement on bath surface. Post installation clean-up generally can be completed using warm water and liquid dishwashing detergent. Stubborn dirt or stains may be removed using granular Spic and Span® mixed with water. Painter's naphtha can be used to remove excess adhesives and/or wet oil-base paint. ROUGH-IN REFERENCES FOR RECESS TYPE INSTALLATIONS TILE TILE BEAD STRIP LEVELING STRINGER 1" x 4" (25mm x 102mm) not for support BATH ADHESIVE SEALANT WALLBOARD NOTE: Tile bead kit not included and must be purchased separately. SECURE THE BATH TO THE STUDS AS SHOWN FOR WOOD OR STEEL STUD CONSTRUCTION. TYPICAL TILE FLANGE INSTALLATION TYPICAL TILE BEAD INSTALLATION STUD WATERPROOF DRYWALL OR CEMENT BOARD WATERPROOF DRYWALL OR CEMENT BOARD TILE SEALANT TUB ROOFING NAIL 1" x 3" (25 x 76mm) WOOD STRINGER FULL LE...
Questo manuale è adatto anche per i modelli :Bagno - 2664 (1.69 mb)
Bagno - 2935 (1.69 mb)
Bagno - 2938 (1.69 mb)
Bagno - 2939 (1.69 mb)