|
Facilità d'uso
Consult Codes for details. 799mm (31-1/2") 409mm (16-1/8") 565mm (22-1/4") 165mm (6-1/2") 293mm (11-1/2") 6065.161 6065.121 6065.111 7095.121 MODEL X Y -C-L- 6065.162 6065.122 683mm (27") RECOMMENDED TOOLS; Fig. 2 1. Teflon Tape 2. Flat Blade Screwdriver 3. Adjustable Wrench 4. Tape Measure 5. Hacksaw 6. Tubing Cutter 7. File 8. For Sweat Connection; Solder and Torch 9. 2.5mm Hex Wrench 10. 1.5mm Hex Wrench Fig. 2 1 2 3 4 5 6 7 9 10 8 10' PRIOR TO INSTALLATION Note: Prior to installing the Selectronic™Flush Valve the following items must be installed. • Flush all water lines prior to operation (See Step 4). Dirt and debris can cause flush valve to run continuously. 1. Water Closet 2. Drain line • With the exception of Supply Stop Inlet, DO NOT use pipe sealant or plumbing grease on any valve component or coupling! 3. Water supply line IMPORTANT: • All plumbing must be installed in accordance with applicable codes and regulations. • Water supply lines must be sized to provide an adequate volume of water for each fixture. • Protect the chrome or special finish on the Flushometer. DO NOT USE toothed tools on finished surfaces to install or service these valves. Also see “Care and Cleaning” section of this manual. • This product contains mechanical and/or electrical components that are subject to normal wear. These components should be checked on a regular basis and replaced as needed to maintain the valve’s performance. 2 M968699 Rev. 1.14 1 INSTALL THE SWEAT SOLDER ADAPTER; Fig. 3 CAUTION Turn water supplies off before beginning Note: Install Optional Sweat Solder Adapter (Supplied) for copper pipe supply line. Fig. 3. 1. Measure the distance (A) from the finished wall to the center of the inlet spud on the fixture. 2. Cut the supply pipe 1-1/4" (A-B=C) shorter then the measurement taken in Step 1. File any rough edges off the end of the supply pipe. 3. Clean the end of the supply pipe. Push the threaded Adapter on until it is seated against the internal stop. Sweat the Adapter to the pipe. 2 INSTALL COVER TUBE, WALL ESCUTCHEON and SUPPLY STOP; Fig. 4 1. Measure from finished wall to first thread of Adapter or threaded supply pipe (dimension “X”). Cut COVER TUBE (1) to length (X). Apply Teflon Tape to the threaded end of the Adapter or supply pipe. Fig. 4a. 2. Push the COVER TUBE (1) into the WALL ESCUTCHEON (2). Slide both onto the SUPPLY PIPE (3). Fig. 4b. 3. Push the COVER TUBE (1) in to expose the threads of the supply pipe. Fig. 4c. With a wrench thread the SUPPLY STOP (4) onto the SUPPLY PIPE (3). Align and tighten. Fig. 4c. 4. Pull COVER TUBE (1) against SUPPLY STOP (4) and push WALL ESCUTCHEON (2) against finished wall. 3 INSTALL DOWN TUBE AND VACUUM BREAKER; Fig. 5 1. Place the SPUD FLANGE (1) over the spud on the Fixture. 2. Thread SPUD COUPLING NUT (2) onto Spud. Make sure SEAL WASHER (3) and FRICTION WASHER (4) are installed. Do not tighten fully. 3. Insert the DOWN TUBE (5) into the SPUD COUPLING NUT (2) and push it down. Note: If cutt...
Questo manuale è adatto anche per i modelli :Plumbing - SELECTRONIC 6065.121 (1.01 mb)
Plumbing - SELECTRONIC 6065.122 (1.01 mb)
Plumbing - SELECTRONIC 6065.122 (1.01 mb)
Plumbing - SELECTRONIC 6065.121 (1.01 mb)