Produttore : Hans Grohe
File Size : 168.59 kb
File Nome :
|
Facilità d'uso
Clean inside sealing surfaces of VALVE BODY (8). Re-assemble PRESSURE BALANCING UNIT (5) and CARTRIDGE (1). Tighten all screws. ■ Turn on water supply and see above for installing TRIM and HANDLE. If it still leaks, replace pressure balancing unit (M952100-0070A). UNABLE TO MAINTAIN CONSTANT TEMPERATURE ■ Remove PRESSURE BALANCE UNIT (5). ■ Remove CAPS (7) and clean valve thoroughly. ■ Examine balancing unit and check condition of O-ring on end of piston. Piston should move back and forth. Order Repair Part M952100-0070A if balancing unit is defective. ■ Replace CAPS (7) and install PRESSURE BALANCE UNIT (5). Make sure inlets line up with two holes in bottom of casting. Top flange should butt-up against top of casting. BACK TO BACK INSTALLATION ■ Remove PRESSURE BALANCE UNIT (5). Rotate PRESSURE BALANCE UNIT (5) 180° so that the inlets face up and the large outlet port faces down. ■ Push PRESSURE BALANCE UNIT (5) in casting make sure inlets line up with holes in bottom of casting. Top flange should butt up against top of casting. Reassemble FIXATION RING (4) and CARTRIDGE (1). CARE INSTRUCTIONS: DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH. DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE. 5 M968235 Rev. 1.5...
Questo manuale è adatto anche per i modelli :Plumbing - TOWNSQUARE T555.500 (168.59 kb)
Plumbing - TOWNSQUARE T555.500 (168.59 kb)
Plumbing - TOWNSQUARE T555.500 (168.59 kb)
Plumbing - TOWNSQUARE T555.501 (168.59 kb)