Log:
Scaricare : 13   File Size : 178 kb   Produttore : Allied International  
Categoria : Apparecchiature di rete
@name

All rights reserved. No part of this publication may be reproduced without prior written permission from Allied Telesyn. Allied Telesyn International, Corp. reserves the right to make changes in specifications and other information contained in this document without prior written notice. The information provided herein is subject to change without notice. In no event shall Allied Telesyn be liable for any incidental, special, indirect, or consequential damages whatsoever, including but not limit

Scaricare : 1   File Size : 178 kb   Produttore : Allied International  
Categoria : Apparecchiature di rete
@name

Tighten the terminals to between 0.6-0.8 Nm (0.041-0.055 pound-force per foot) e) Ensure there are no exposed conductor strands f) Secure the supply cable (to the rack framework or similar object) so that the connections are isolated from any force applied to the cable g) Ensure the circuit breaker is in the Off position h) Connect the supply-cable wires to the circuit breaker i) Energise the circuit breaker C613-04042-01 REV D Quick Install Guide Quick Install Guide 38-75VDC , 2A FOR CENTRALIZE





categorie