Log:
valutazioni - , GPA: ( )

Istruzioni per l'uso Impex, Modello AX-PWR7

Produttore : Impex
File Size : 3.85 mb
File Nome : 18aa9986-a68b-478d-8079-68e829b29f9a.pdf

Lingua di insegnamento: en

Il documento viene caricato, si prega di attendere
Il documento viene caricato, si prega di attendere

Facilità d'uso


Securely tighten all nuts and bolts previously installed. D.) Insert two Weight Posts (#63) to the holes on the Left & Right Supports (#50 & 51). Secure each Weight Post with one M10 x 5/8” Allen Bolt (#88) and ..” Washer (#42). Slide an Olympic Sleeve (#20) onto each Weight Post. Attach a Spring Clip (#22) to the Olympic Sleeve. E.) Insert the Left & Right Bar Holders (#93 & 92) into the selected holes on the Upright Beams. Insert the Left & Right Safety Catches (#58 & 59) into the selected holes on the Upright Beams. 11 STEP 8 (See Diagram 8) A.) Slide the Sliding Weight Post (#56) onto the Rear Vertical Frame (#52). Slide the Sliding Pulley Bracket (#57) onto the Front Vertical Frame (#54). Use a Lock Knob (#23) to hold the Sliding Pulley Bracket in position. B.) Insert the Upper Frame (#55) into the top opening on the Front Vertical Frame (#54). Attach the rear end of Upper Frame to the Rear Vertical Frame. C.) Secure the Upper Frame with two M10 x 5/8” Allen Bolts (#88) and . .” Washers (#42). Secure the Upper Frame with two M10 x 2 3/8” Allen Bolts (#87), one 2 .” x 1 .” Bracket (#66) and two ..” Washers (#42). D.) Slide two Olympic Sleeves (#20) onto the posts on the Sliding Weight Post. Attach two Spring Clips (#22) to the Olympic Sleeves. E.) Connect the Chain (#91) to the Lat Bar (#61) with a Hook (#90). DIAGRAM 8 12 CABLE LOOP DIAGRAM 13 STEP 9 (See Diagram 9 & Cable Loop Diagram) A.) Attach the 100” Upper Cable (#68) to the opening on the front Upper Frame (#55). Make sure the ball stopper of the Cable is under the Frame. B.) Attach a Pulley (#70) to the opening. Secure it with one M10 x 2 .” Allen Bolt (#85), two 5/8” Pulley Bushings (#79), and one M10 Aircraft Nut (#44). C.) Draw the Cable along the Upper Frame towards the back of the machine to the opening on the Upper Frame. Repeat Step B above to install a Pulley. D.) Draw the Cable around the Pulley and downward. Attach a Pulley to the Double Floating Pulley Bracket (#62). Secure it with one M10 x 1 .” Allen Bolt (#86), two . .” Washers (#42), and one M10 Aircraft Nut (#44). Let the Bracket hanging for now. E.) Draw the Cable around the Pulley and up to the opening on the top of the Rear Vertical Frame (#52). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#87), two .” Pulley Bushings (#78), and one M10 Aircraft Nut (#44). F.) Draw the Cable down to the Sliding Weight Post (#56). Secure the end of the Cable with one M10 x .” Allen Bolt (#36), two . .” Washers (#42) and one M10 Aircraft Nut (#44). DIAGRAM 9 14 STEP 10 (See Diagram10 & Cable Loop Diagram) A.) Attach the 268” Lower Cable (#69) to the Sliding Pulley Bracket (#57). Attach two Small Pulleys (#71) to the Brackets. Secure them with two M10 x 1 .” Allen Bolts (#86), four . .” Washers (#42), and two M10 Aircraft Nuts (#44). B.) Draw the Cable upward to the opening on top of the Front Vertical Frame (#54). Attach a Pulley (#70) to the opening. Secure it with one M10 x 2 .” Allen Bolt (#85), two 5/8” Pulley Bushings (#79), and one M10 Aircraft Nut (#44). C.) Draw the Cable over the Pulley and down to the open bracket on the Front Vertical Frame (#52). Install a Pulley with one M10 x 2 .” Allen Bolt (#84), two .3/4” Washers (#42), and M10 Aircraft Nut (#44). Push the Pulley to the left side and do not tighten the nut and bolt yet. D.) Pull the Cable around the Pulley then up to the Double Floating Pulley Bracket (#62) previously installed in Step 9. E.) Attach a Pulley to a selected hole on the Bracket. Secure it with one M10 x 1 .” Allen Bolt (#86), two . .” Washers (#42), and one M10 Aircraft Nut (#44). After completing the cable installation, check the tightness of the cables. If the cable is too loose, move up the pulley. If the cable is too tight, move down the pulley. F.) Draw the Cable around the Pulley then down to the bracket on the Front Vertical Frame. Attach another Pulley to the right of the Pulley previously installed in Step C. Secure the two Pulleys together with the same nut and bolt previously installed. G.)Draw the Cable around the Pulley then up and clip to the back of Sliding Pulley Bracket (#57). H.) Connect the Shiver Bar (#67) or the Single Handle (#94) to the Cable by a Hook (#90) for various exercises. 15 DIAGRAM 10 16 17 18 PARTS LIST KEY NO. DESCRIPTION Q’ty Main Frame 1 51 Right Support 1 Front Stabilizer 1 52 Rear Vertical Frame 1 Rear Stabilizer 1 53 Rear Stabilizer 1 Arm Curl Stand 1 54 Front Vertical Frame 1 Leg Developer 1 55 Upper Frame 1 Seat Support Frame 2 56 Sliding Weight Post 1 Backrest Support 2 57 Sliding Pulley Bracket 1 Sliding Block 1 58 Left Safety Catch 1 Incline Adjustment Bar 1 59 Right Safety Catch 1 Foam Tube 3 60 Chrome Panel 2 Curl Bar Support Frame 1 61 Lat Bar 1 Curl Handle Tube 2 62 Double Floating Pulley Bracket 1 Seat Pad 1 63 Weight Post 2 Backrest Board 1 64 5” x 1 5/8” Bracket 2 Arm Curl Pad 1 65 4 3/8” x 2 3/8” Bracket 1 Curl Handle Grip 4 66 2 .” x 1 .” Bracket 1 Axle 1 67 Shiver Bar 1 O 2 3/8” ...

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie