Log:
valutazioni - 2, GPA: 3.5 ( )

Istruzioni per l'uso Weil-McLain, Modello GAS CONVERSION KIT GV-5 510-811-610

Produttore : Weil-McLain
File Size : 36.8 kb
File Nome : gv_gas_conversion_instructions.pdf
Lingua di insegnamento: en
Vai a scaricare



Facilità d'uso


CHANGING OR MODIFYING IN ANY WAY CAN CAUSE SEVERE PERSONAL INJURY, DEATH, OR PROPERTY DAMAGE. DO NOT LEAVE ANY UNINSTALLED ORIFICE PLATES IN THE BUILDING. 550-110-085/0501 PROPANE CONVERSION IS EASIEST WHEN BOILER IS ON SKID. A 1. REMOVE JACKET FRONT PANEL. 2. LOCATE EXISTING ORIFICE PLATE BETWEEN BLOWER HOUSING AND GAS/AIR MANIFOLD. 3. REMOVE FRONT 2 SCREWS HOLDING GAS/AIR MANIFOLD AND ORIFICE PLATE TO BLOWER HOUSING. LOOSEN BACK 2 SCREWS. 4. PULL OUT EXISTING ORIFICE PLATE. 5. SLIDE IN NEW ORIFICE PLATE UNTIL FRONT SCREW HOLES LINE UP. 6. INSTALL FRONT 2 SCREWS. 7. TIGHTEN ALL 4 SCREWS EVENLY. 8. BEND DOWN FRONT LIP ON ORIFICE PLATE. 9. REPLACE JACKET FRONT PANEL. 10. AFFIX CONVERSION LABEL ON LEFT SIDE OF BOILER ABOVE GAS PIPING, ON TOP OF RIVETS. 11. SEE BOILER MANUAL PACKED WITH BOILER FOR GAS LEAK TEST AND START-UP/CHECK-OUT PROCEDURES. BLOWER HOUSING J,VJ ORIFICE PLATE FRONT LIP GAS/AIR MANIFOLD NOTES: 1. DO NOT ATTEMPT TO CHANGE MANIFOLD GAS PRESSURE. GAS VALVE IS SET CORRECTLY FOR NATURAL OR PROPANE. 2. CHECK GAS INLET PRESSURE (MIN. 4” W.C., MAX. 13” W.C.) WITH MANOMETER BY CONNECTING TO GAS INLET PRESSURE TAP ON THE GAS VALVE LOCATED JUST ABOVE THE GAS INLET PIPING. UIIILHIeUUN A Unitejd Dcmhkjn Company Weil-McLain 500 Blaine Street Michigan City, IN 46360-2388 http://www.weil-mclain.com...

Questo manuale è adatto anche per i modelli :
scaldabagno - GAS CONVERSION KIT GV-3 510-811-600 (36.8 kb)
scaldabagno - GAS CONVERSION KIT GV-4 510-811-605 (36.8 kb)
scaldabagno - GAS CONVERSION KIT GV-6 510-811-615 (36.8 kb)

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie