|
Facilità d'uso
(c) Slide the third deck into the center section. (d) Use metal shims to level the decks. (e) Use wedges in the back and on the sides of the deck if the decks are loose. The three decks should be tight against each other with no gap between them (See fig. 8). (f) Put the hearth trim in place between the deck and the door. WedgesFigure #8 C. Four Deck Installation: (a) Slide one deck into the baking chamber and push it as far as possible to one side towards the rear. (b) Slide the second deck into the baking chamber and push it next to the first deck in the rear. (c) Slide the third and the fourth decks in front of the decks already in place. (d) Use metal shims as needed to level the decks. (e) Use wedges in the back and on the sides of the deck if the slabs are loose. The four decks should be tight against each other with no gap between them (See fig. 9). (f) Put the hearth trim in place between the deck and the door. WedgesFigure #9 NOTE: IF THE SIDE WEDGES ARE PUSHED IN TOO TIGHT, THE HEAT CONTROLS, OPERATED BY THE BLACK KNOBS, LOCATED ON THE FRONT OF THE OVEN, WILL NOT SLIDE FREELY. 5. GAS AND ELECTRIC CONNECTIONS: Propane gas units are not available in the European Community Countries. (a) The appliance when installed, must be electrically grounded in accordance with local codes and/or the latest edition of the National Electric Code ANSI/NFPA 70 in USA (Canadian Electric Code CSA C22.2 in Canada). (b) In Europe, appliance must be connected by an earthing cable to all other units in the complete installation and thence to an independent earth connection in compliance with EN 60335-1 and/or local codes (c) The ovens should not be installed on the same line with space heaters, boilers or other gas equipment with high intermittent demand. (d) Use a pipe joint compound that is resistant to the action of liquefied petroleum gases when making gas connections. (e) For Propane gas, use at least 1/2" (13 mm) pipe or tubing with a 5/8" (16 mm) inside diameter. For Natural gas, use 3/4" (19 mm) pipe. (f) The appliance must be isolated from the gas supply piping system by closing its manual shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than . psig (3.45kpa). (g) The appliance and its shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2" psig (3.45kpa). (h) The gas pressure regulator is part of the combination valve and is adjusted to yield a pressure of 3.5" water column (9mbar) for Natural Gas. If the oven is ordered for use on Propane Gas, the pressure regulator in the combination valve is preset at the factory to yield a pressure of 10" water column (25 mbar). Units for use on Propane Gas are not available for European Community Countries. (i) A separate shut-off valve for each oven must be provided. It should be as close as possible to the place where the gas supply line goes into the oven. It must be located such that it is easily accessible. (j) When stacking with another oven, two shut-off valves, one for each of the two ovens, must be provided. After the Gas Supply has been connec...
Questo manuale è adatto anche per i modelli :Forni elettrici - 125 (297.65 kb)
Forni elettrici - 300 (297.65 kb)
Forni elettrici - 400 (297.65 kb)
Forni elettrici - 800 (297.65 kb)