Produttore : Superior
File Size : 4.94 mb
File Nome :
|
Facilità d'uso
Gas conversion kits are available to adapt your appliance from the use of one type of gas to the use of another. These kits contain all the necessary components needed to complete the task including labeling that must be affixed to ensure safe operation. Kit part numbers are listed here and the following steps detail the conversion procedure. Refer to the instructions provided with the conversion kit when performing any gas conversion. Gas Conversion Kits WARNING This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instruction is not followed exactly, a fire, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper and complete until the operation of the converted appliance is checked as specified in the manufacturer’s instructions supplied with the kit.The qualified service agency performing this installation assumes responsibility for this conversion. AVERTISSEMENT Cette trousse de conversion doit etre installee par un technicien agree, selon les instructions du fabricant et selon toutes les exigences et tous les codes pertinents de l’autorite competente. Assurez-vous de bien suivre les instructions dans cette notice pour reduire au minimum le risque d’incendie, d’explosion ou la production de monoxyde de carbone pouvant causer des dommages materiels, des blessures ou la mort. Le tecnicien agree est responsable de l’installation de cette trousse. L’installation n’est pas adequate ni complete tant que le bon fonctionnement de l’appareil converti n’a pas ete verifie selon les instructions du fabricant fournies avec la trousse. Le fournisseur de service qualifie ayant realise l'installation assume les responsabilites liees a la conversion. SIT Millivolt Gas Valve SIT Millivolt Gas Valve Figure 61 Remove These Components Step 6. See Figure 62 and remove the pilot hoodassembly toaccessthe hexedpilotorifice. Remove and replace the orifice with the one provided with the kit. Pilot for SIT Millivolt Gas Valve Pilot Orifice Figure 62 Electronic Appliances Step 7. Honeywell Electronic Valves -See Figure 63 and the instructions provided with the kit. Remove the slotted cap screw, o-ring, pressure-regulatingadjustingscrewandspring. Retain all parts for possible later use. Install new components from the kit. Black cap and red spring for propane gas appliances. Silver cap and stainless steel spring for natural gas appliances. PSIOFFIONCONTROLIGNITEGas Valve Assembly Manifold Pressure Test Port Slotted Cap SpringAdjusting Screw Figure 63 Step 8. See Figure 64 and replace the pilot orificeasfollows: Removetheigniterassembly retainer clip, and carefully remove the igniter assembly. Remove the screw securing the pilot assembly to its mounting bracket. Back off the flare nut at the end of the pilot gas line to free the pilot assembly from the gas line. Remove the pilot orifice and replace it with the one provided with the conversion kit. Reinstall the pilot assembly by reversing the steps detailed here. When reinstalling the igniter assembly, use extreme care to prevent damage and breakage. Do not apply any leverage to the igniter assembly while restoring the retainer clip to its original position. Figure 64 Pilot Orifice Pilot Assembly Igniter Assembly Retaining ClipFlare Nut Note: If the igniter is damaged, a replacement kit is available, order Catalog No. 87L54. All Models Step 9. (Refer to Figure 60 on Page 35 and Figure 65 on Page 37) VERIFY THE PROPER ORIFICE SIZES BEFORE INSTALLING THEM. A. Remove the two orifices from the manifold and replace them with the ones provided in the kit. Table 10 shows the orifice sizes for natural and propane models. Figure 65 illustrates the orifice. Use pipe joint compound or Teflon tape on all pipe fittings before installing (ensure propane resistant compounds are used in propane applications, do not use pipe joint compounds on flare fittings). B. Install rear burner first, followed by front burner, as shown in Figure 66 on Page 37. Ensurethatthearmoftheventuriofeachburner is hooked onto the air shutter adjustment lever (refer to Figure 60 on Page 35). The primary air opening can be adjusted by rotating the adjustment lever from beneath the firebox floor. Refer to Figure 57 on Page 31 for the recommended minimum primary air opening setting. NOTE: Each model has two burners and 2 Orifices. Burner Orifice Sizes Elevation 0-4500 feet ( 0-1372 meters) Model Series Nat.Gas drill size (inches) Propane drill size (inches) SSDVST SSDVPF #44 (.086") * 60J80 • #55 (.052")** 19L52 • Table 10 * Standard size installed at factory ** Standard size in LP conversion kit • Part /Cat. Number NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. R ORIFICE Figure 65 St...
Questo manuale è adatto anche per i modelli :Camini - SSDVPF-CNE-B (4.94 mb)
Camini - SSDVPF-CNE-B (4.94 mb)
Camini - SSDVPF-CNE-B (4.94 mb)
Camini - SSDVPF-CNE-B (4.94 mb)