
Make sure SEAL WASHER (3) and FRICTION WASHER (4) are installed. Do not tighten fully. 3. Insert the DOWN TUBE (5) into the SPUD COUPLING NUT (2) and push it down. Note: If cutting Down Tube (5) to size, note that Critical Line (C/L) on Vacuum Breaker must typically be 6" (152mm) above fixture. Consult Code for details. Fig.3 CENTER LINE OF FIXTURE SPUD FINISHED WALL FILE EDGES SOLDER ADAPTER ADAPTER 32mm (1-1/4) A (A-B)= BC CLEAN Fig. 4 Fig. 4a Fig. 4b Fig. 4c 1 1 4 2 3 TEFLON TAPE FINISHED WAL