Log:
valutazioni - 0, GPA: 0 ( )

Istruzioni per l'uso HP, Modello HP 8/20q Fibre Channel 8-ports Active Switch

Produttore : HP
File Size : 256.77 kb
File Nome :
Lingua di insegnamento: en
Vai a scaricare



da questo dispositivo ha anche altre istruzioni :

Facilità d'uso



Multiple rack-mounted devices connected
Before you begin
to the same AC supply circuit may
overload that circuit or the AC supply
wiring. Consider the power source
WARNING! To reduce the risk of personal
capacity and the total power usage of all
injury or damage to the equipment, ensure the
switches on the circuit.
fol owing:

Reliable grounding in the rack must be

In single-rack installations, stabilizing feet
maintained.
are attached to the rack.

In multiple-rack installations, racks are
coupled together.

Leveling jacks on the rack are extended to
Collect the required items
the floor.

The full weight of the rack rests on the
NOTE: The rack-mount kit installation requires
leveling jacks.
one technician.

Heavy items, such as uninterruptible
power supplies and hard drive storage
Locate the following items and set them aside:
enclosures, are installed near the bottom
of the rack.

8/20q or SN6000 Fibre Channel Switch

Similar components are installed next to

8/20q and SN6000 Fibre Channel Switch
each other in the rack. Because devices
rack-mount kit
are of differing depths, this facilitates
Smaller items, such as screws, ship in plastic
maintenance and service tasks.
bags in the kit. See Table 1.

Only one device in a rack is extended at
Required tools:
a time. A rack may become unstable if
more than one device is extended.

#2 Phil ips screwdriver

7/16-inch wrench
CAUTION:

For proper airflow, the SFP+ media side
Verify the kit contents
(port side) of the device must face the front
of the rack. Mounting the switch in this
Check the contents of the 8/20q and SN6000 Fibre
direction al ows air to enter from the front
Channel Switch rack-mount kit shipping carton to
of the rack (SFP-port side of switch) and
verify that all required parts and hardware are
exit through the back of the rack
available (Table 1).
(power-supply side of switch). This
Table 1 8/20q and SN6000 Fibre Channel Switch
prevents overheating, which may cause
rack-mount kit hardware
equipment in the rack to fail.

Provide a minimum of 63.5 cm (25 in)
Item
Description
clearance in front of the rack to allow the
doors to open fully, and 76.2 cm (30 in)
in back of the rack to al ow for servicing
Two (2) rear mounting brackets
and airflow.

If the device is mounted in a closed rack
or there are multiple rack-mounted
Two (2) switch rails
devices, make sure that the operating
temperature inside the rack enclosure
does not exceed the maximum rated
ambient temperature.
One (1) filler panel (optional), see
step 7.
Page 2


...

Questo manuale è adatto anche per i modelli :
dati dispositivi di elaborazione - HP 8/20q Fibre Channel Switch/S-Buy (256.77 kb)
dati dispositivi di elaborazione - HP 8Gb Simple SAN Connection Kit (256.77 kb)
dati dispositivi di elaborazione - HP SN6000 Stackable 8Gb 24-port Dual Power Fibre Channel Switch/S-Buy (256.77 kb)
dati dispositivi di elaborazione - HP SN6000 Stackable 8Gb 24-port Single Power Fibre Channel Switch (256.77 kb)

Scrivi la tua opinione del dispositivo



Il messaggio
Il tuo nome :
Inserire le due cifre :
capcha





categorie