|
Facilità d'uso
Continuous test forabout 10 minutes isnecessaryYesContactElectricianDefectiveOKCheck if fuse isinstalled correctlyand power supply SECTION 7 – EXCHANGE OF SPARE PARTS CAUTION All spare parts and or accessories, may only be replaced by authorized service personnel. CAUTION In order to guarantee safety, use only genuine OEM spare parts and accessories purchased directly from a Garland authorized part/service distributor. If other components are used, no liability will be accepted. CAUTION The electrical supply must be disconnected. To Open The Induction Unit (Counter Top Models) • Turn the induction unit. • Remove M4x8 screws. • Turn induction unit back in normal position. • Lift cover, turn away at the right side, put it at the side panel. • Remove coil carrier: remove 2 stop nuts at the left. • Remove M4 screws. • Remove screws A1 and A2. • Turn away coil carrier at the left. To Open The Induction Unit (Built In Models) • Remove M4 screws on the right side. • Lift cover with the glass. • Remove M4 screws, remove coil carrier. • Remove PT-sensor and coil connections. SECTION 8 – ADJUSTMENT OF PROCESS PARAMETERS The induction unit (excluding all WOK-units) with new Cu sensors can be adjusted. This can be done either by means of the short circuit service plug (Poti-LED) part number (94900096) or by PC/Laptop. In addition, the pan detection and the power performance, can be adjusted by the hyperterminal program of the PC/Laptop. Please refer to Section 9 “IR Interface” for instructions on how to use the hyperterminal program. Initializing CU Sensors By The Short Circuit Plug If only the CU sensor is exchanged, the new CU sensor can be initialized by means of the short circuit service plug (Poti- LED). For this, you will not need the PC or Laptop. The pan detection and the performance will not have to be changed. Procedure of Initialization: • The cooking area must be clear of any items. • Surrounding temperature 25°C (+/- 3°C) or 77°F (+/- 37.4°F). • Disconnect the induction unit from the main power supply. • Place short circuit service plug into the power print board across the (Poti-LED) as showed in the photo below. • Connect the induction unit to the main power supply. • The CU sensors initialize automatically. • After successful initialization, the green LED on the small CPU-print (board) illuminates. • In case the system finds an error during initialization, the red LED will illuminate. • Disconnect the induction unit from the main power supply. • Check the CU sensors at the plug by means of the Ohm meter. • Re-start the procedure of initialization. • Disconnect the unit from the main power supply. • Remove the short circuit service plug from both the Poti and LED connections. Initializing The Induction Unit By PC Or Laptop The initialization of the CU (RTCS) sensors (excluding all WOK models), as well as adjustments of the pan detection and power performance, can be performed by means of the hyperterminal program. Please refer to Section 9 “IR...
Questo manuale è adatto anche per i modelli :Piani di cottura - GIWOK 3.5 (SH/WO 3500) (2.53 mb)
Piani di cottura - GIU 1.5 (BH/BA 1500) (2.53 mb)
Piani di cottura - GIU 1.8 (BH/BA 1800) (2.53 mb)
Piani di cottura - GIU 2.5 (BH/BA 2500) (2.53 mb)