|
da questo dispositivo ha anche altre istruzioni :
Facilità d'uso
5.
If there are adjacent modules:
3.
Power on the library by pressing the power button
a.
From the front of the library, use your fingers
on the base module just below the OCP; the green
to loosen the captive thumbscrews on each
light will illuminate. When the library is powered
side of the module being installed and all
on, it inventories the tape cartridges in the
modules above it two full turns.
magazines, checks the firmware version on all
b.
From the back of the library, starting with the
modules, configures the tape drives, confirms the
module being installed and the one below
presence of the existing modules, and searches
it, align the modules and lock them together.
for any new modules.
Repeat for each pair of modules above the
module being installed.
i.
Use your fingers to loosen the
Verifying the installation
thumbscrew on the alignment
mechanism that will connect the upper
Verify that the library initializes correctly, and that the
module with the lower module.
status is Ready. From the OCP or RMI, verify that the
replacement module is visible.
ii.
Lower the alignment mechanism. If you
encounter resistance, adjust the upper
Return the tape cartridges to the module in their same
module so the pin in the alignment
locations.
mechanism moves into the hole in the
For troubleshooting information, see the HP StoreEver
lower module. When the alignment
MSL6480 Tape Library User and Service Guide
mechanism is in the locked position,
available from the HP website: http://www.hp.com/
tighten the thumbscrew with your fingers.
go/msl.
2
1
Getting help
•
HP Product information: http://www.hp.com/go/
msl
•
HP technical support and phone numbers:
www.hp.com/support
3
•
HP Library & Tape Tools (L&TT) diagnostic
software: www.hp.com/support/tapetools
c.
From the front of the library, tighten the
thumbscrews on all modules with your
Documentation feedback
fingers.
Send any errors, suggestions, or comments to
Documentation Feedback (docsfeedback@hp.com).
Replacing the cables and powering on the
library
1.
Replace any SAS, FC, Ethernet, or expansion
interconnect cables you removed earlier.
2.
Plug the power cables into the power connectors
on the module that was reinstalled and into power
outlets.
Page 6
...