![](/images/flag/s/en.gif)
Follow all local codes. Installation Items Needed Before installing heater, make sure you have the items listed below. • piping (check local codes) • sealant (resistant to propane/LP gas) • equipment shutoff valve * • test gauge connection * • sediment trap • tee joint • pipe wrench * An CSA/AGA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. WARNING: Never connect heater to private (non-utility) gas wells. This gas is commonly kn