7. Disconnect the LH electrical plug from the bottom valve. 8. Turn the boiler on and set the low pressure to the value given in Table 1, using the low rate adjustment screw inside the spindle of the top valve. 9. Turn the appliance off and reconnect all the electrical plugs. Do not overtighten the electrical plug fixing screws. 10. Refit both dust covers over the adjustment screws and refit the pressure test point screw. 11. Check for gas soundness. INSTALLATION INSTALLATION Concord CXSi/H - In
9. Secure both phials into the thermostat pocket in the flow header, using the spring clip. 10. Fit the earth connections from the terminal plug-in connections to the appropriate earth posts on the back of the control box. Connect the earth lead prefitted to the control box back panel to the threaded hole in the casing support frame. 11. Fit the casing upper front panel with its location buttons in the slots and push down to locate. Fasten at the bottom, using the No.8 screws. 12. Fit the casing
Care should be taken to ensure the specification of the chimney is suitable for the application by reference to the manufacturers literature. Caradon Ideal Limited can offer advice on the design of suitable chimney systems. GAS SUPPLY If there is any doubt regarding the capacity of the gas meter, the available gas pressure, the adequacy of existing service pipes or the size required for new service pipes then the advice of the gas supplier should be requested. Installation pipework should be fit
The appliance operation light A will flash every 4 seconds. For long periods When you do not expect to use the boiler for a long period: 1 Switch the electricity supply off. 2 Shut off the gas supply cock and the valves for the water circuits fitted under the boiler. 3 If necessary, empty the water circuits. FROST PROTECTION This appliance is provided with a built in anti---freeze system that operates the boiler when the temperature is below 5 uC Therefore, when the boiler is not lit and used in
January 2008 UIN 201 850 A06 For the very latest copy of literature for specification purposes please visit our website where you will be able to download the relevant information in pdf format. classic HE -Installation & Servicing DOCUMENT AMENDMENTS Relevant Installation changes implemented in this book from Mod Level ............ A05 (Oct 06) to A06 (Jan 08) • Various Pages Company Name Change. • Page 26 & 27, Frames 39 & 40 - Condensate Pipe Termination Configurations BS6798 recommends that
Constructed with 2" or 13/8" insulation pressure bonded between two steel skins, these doors provide the ultimate in durability, strength and energy efficiency. Quieter than other insulated and non-insulated doors, Premium Value Stamped Steel doors are the best choice for homes with rooms adjacent to or above the garage. Available in two Carriage House emboss designs, short and long. To further accentuate the Carriage House appearance, these doors come standard with beautiful decorative hardware
Planar • 62 Models • Heights 300, 400, 500, 600mm • Lengths 400 - 2000mm • Output 235 - 3268 watts • Types K1 & K2 • 6 Tappings - Pre-piped TBSE • Flat fronted design Options See page 31 29 data & dimensions data & dimensions Height Length Elements Plane Plane (mm) (mm) Single Double Data & Dimensions - Plane 440 500 6 382 673 440 600 6 458 808 440 700 6 535 942 440 800 6 611 1077 440 900 6 688 1211 440 1000 6 764 1346 440 1100 6 840 1481 440 1200 6 917 1615 440 1400 6 1070 1884 440 1600 6 1222