Log:

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-90

Scaricare : 21 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

Power venter improperly wired. 2. Main burner did not light on call for heat. 3. Defective control board. 4. Loss of pressure. Pressure switch not made. 1. Check power venter circuit per wiring diagram. 2. Heater is in lockout mode check flash code table for problem. 3. No flash codes present along with no call for heat, replace control board. 4. Check venting for blockage. Check tubing for blockage or hole. Check spud for blockage. 36 Table 10A - Troubleshooting with LED Indicator Assistance fo

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-75

Scaricare : 21 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

(610m) or less. When installed in Canada, any references to deration at altitudes in excess of 2000 ft. (610m) are to be ignored. At altitudes of 2000 to 4500 ft. (610 to 1372m), the unit heaters must be orificed to 90% of the normal altitude rating, and be so marked in accordance with ETL certification. TUBULAR UNIT HEATER HIGH ALTITUDE DERATION This Tubular Unit Heater has been manufactured utilizing standard burner orifices and a normal manifold pressure setting as per the specifications show

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-60

Scaricare : 35 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

A single length of double wall Type B vent pipe must be used to go through the concentric vent box and outside wall to the vent terminal. 5. Any run of single wall vent pipe passing through an unheated space must be insulated with an insulation suitable to 550° F. 6. The vent system must be installed to prevent collection of condensate. Pitch horizontal pipes downward 1/4 inch per foot (21mm per meter) toward the vent cap to facilitate drainage. Vertical vent pipes should be piped as depicted in

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-45

Scaricare : 5 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

5. Seal all vent pipe joints and seams to prevent leakage. Use General Electric RTV-108, Dow- Corning RTV-732, or equivalent silicone sealant with a temperature rating of 500 deg. F, or 3M # 425 aluminum foil tape (or equivalent). The vent system must be installed to prevent collection of condensate. Pitch or 3M #425 aluminum foil tape (or equivalent). 7. Avoid running vent pipe through unheated spaces. When this cannot be avoided, insulate the pipe to prevent condensation of moisture on the wal

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-30

Scaricare : 8 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

The appliance must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa). 9 ELECTRICAL CONNECTIONS HAZARDOUS VOLTAGE! DISCONNECT ALL ELECTRIC POWER INCLUDING REMOTE DISCONNECTS BEFORE SERVICING. Failure to disconnect power before servicing can cause severe personal injury or death. Standard units are shipped for use on 115 volt, 60 hertz, s

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-120

Scaricare : 5 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

For unit installations in U.S.A. above 2,000 ft. (610m), the unit input must be derated 4% for each 1,000 ft. (305m) above sea level; refer to local codes, or in absence of local codes, refer to the latest edition of the National Fuel Gas Code, ANSI Standard Z223.1 (N.F.P.A. No. 54), (also refer to Table 6). 4 5 Figure 2 - Dimensional Drawing – Tubular 30 thru 120 Propeller Unit Heater DIMENSIONS .XXX STANDARD UNITS DIMENSIONS IN PARENTHESIS (XXX) MILLIMETERS INSTALLATION Do not install unit hea

Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-105

Scaricare : 49 File Size : 3 mb    Produttore : Sterling  
Categoria : attrezzature di pompaggio

RECORD THE UNIT MODEL AND SERIAL No.(s) IN THE SPACE PROVIDED. RETAIN FOR FUTURE REFERENCE. Model No. Serial No. FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. FOR YOUR SAFETY WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance. Do not touch any electrical switch; do not use any phone in your building. Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions. If

Sterling Mobility Scooter

Scaricare : 26 File Size : 905 kb    Produttore : Sterling  
Categoria : Sedie a rotelle

This Owner’s Manual will familiarise you with the scooter and its features. It contains guidance on everyday usage and general care in addition to information on the high quality standards which we adhere to and details about the warranty. Your scooter will reach you in excellent condition having been personally inspected before leaving the factory. By following the guidelines for maintenance on page 30 your scooter will maintain its first class condition and give you years of complete reliabili

Sterling EX918

Scaricare : 1 File Size : 2 mb    Produttore : Sterling  
Categoria : Rettificatrici

Once clearance is established, fully tighten the adjustment cam screws. 6. Repeat steps 1 through 5 for all bed combs. 7. Fully tighten all bed comb adjustment screws to 12 ft/lbs. 5-5 Adjusting the Sensitivity of the Optional Bin LevelMonitor !!! DANGER !!! Because electrical power must be supplied to the sensor to permit testing andadjustment, it is EXTREMELY VITAL that you secure the machine for normaloperations. Do so by closing the cutting chamber and hopper access door, which returns thesa

Sterling EX913

Scaricare : 1 File Size : 2 mb    Produttore : Sterling  
Categoria : Rettificatrici

1. Turn the main disconnect to the ON position. 2. Start the granulator by pressing the start button at the operator station. 3. Load feedstock at a uniform rate that does not exceed the capacity of the machine; see Table 1: Granulator Specifications. 4. For color and/or material changes, allow all existing material to clear the granulator and any downstream equipment before stopping the machine. Doing so reduces cleaning requirements. 4-4 Cleaning Out the Granulator To open the granulator and o





categorie